Cracked tile, a shower that leaks into the room below, a tub that has gotten hard to step into.
Sometimes the answer is a tub to shower conversion. Sometimes it is a full gut down to the studs and subfloor, so the waterproofing behind the new tile is done right. We look at it with you and tell you which one your bathroom needs.
This bathroom went from a dated tub surround and a torn up floor to marble look tile, a new vanity, black fixtures, updated lighting, a new exhaust fan and wood look flooring. Same room, same angle.


See more finished bathrooms on our project gallery.
A straightforward tub to shower conversion sits at the low end and can be done in a couple of days. A full gut with custom tile lands toward the top and takes most of a week. When we look at your bathroom, you get a fixed number for your exact job.
We build bathrooms to last. Waterproofing, ventilation and a solid substrate come first, since that is what keeps a shower watertight years down the road. We use materials made for wet rooms and follow the right order of work from demo to the final bead of caulk.
Reputation matters to us. Our crews show up on schedule, keep the workspace clean, and walk the finished bathroom with you before we consider the job done. Most of our remodel work comes from referrals and we intend to keep it that way.
Pricing
Every bathroom lands somewhere between $4,500 and $16,000, and these are the things that decide where yours falls.
A tub to shower conversion touches one wall. A full gut touches all of them, plus the floor and everything behind the walls.
A quality surround installs in a day and keeps the budget down. Full custom tile looks incredible and adds days of skilled labor.
Vanities, faucets and shower hardware run from builder grade to statement piece. We install what fits your budget and tell you where spending more actually shows.
Keeping the toilet, sink and shower where they are keeps costs down. Moving them means opening the floor, and the price follows.
Grab bars, low thresholds, benches and wider access are modest additions on their own. A full ADA conversion is scoped as its own project.
Step by step
We look at the bathroom, talk through what you want, and give you a fixed written number for your job. Not a range, a number.
You pick the tile, surround, vanity and fixtures. We order everything before demo day so the job never stalls waiting on a part.
Demo, rough in, board, tile or surround, fixtures, paint and trim. Most bathrooms run 2 to 7 working days, and we walk the finished room with you before we call it done.
What you want the room to do, a rough budget, and whether it is your only bathroom so we can plan around it.
Most bathrooms take 2 to 7 working days once demolition starts, with materials ordered ahead so the job does not stall.
Questions
Where we work
We remodel bathrooms in Dayton, Beavercreek, Kettering, Xenia, Bellbrook, Fairborn, Centerville, Springboro and the surrounding Miami Valley. The same crews that handle our restoration work build these bathrooms, which is why the timelines are honest and the finished work holds up.
Tell us what is going on and what town you are in. We will come out, take a look, and give you a real number.
Rather talk now? Call (937) 245-1101.
★★★★★"They're great to work with and are super reliable."
Darrione